Non-Conformance Reports
Create and manage Non-Conformance Reports (NCRs) in IEMSuite to document quality failures, track root causes, and record corrective actions.
A Non-Conformance Report (NCR) is the formal record of a quality failure. NCRs document what failed, why it failed, and what corrective actions were taken - creating a permanent paper trail for compliance and continuous improvement.
What Is an NCR?
NCRs in IEMSuite are created when:
- A QC inspection job is marked as FAILED (auto-created)
- A user manually creates an NCR for an issue found outside a formal inspection
- A customer complaint triggers a quality review of a shipped lot
NCR Creation
NCR is created automatically on QC Fail
If you failed an inspection, the NCR is pre-populated with the lot, product, inspection job, and failing parameters.
Add a title and description
Summarize what the non-conformance is in plain language.
Set severity
Choose from Minor, Major, or Critical. See Severity Levels below.
Assign to a responsible team member
The assignee will investigate and drive resolution.
Set a target resolution date
Defaults to 5 business days. Critical NCRs default to 24 hours.
Save
NCR is created in OPEN status. The linked lot remains in QUARANTINE.
Severity Levels
MINOR
Small deviations that do not affect product safety or core function. Example: cosmetic defect, label misalignment.
MAJOR
Significant deviations that affect product quality or compliance. Example: out-of-spec nutrient content, wrong fill weight.
CRITICAL
Safety issues or regulatory violations. Example: contamination, undeclared allergen, dangerous foreign object. Triggers immediate escalation.
Root Cause Analysis
The NCR detail page includes a Root Cause section where you document:
- Immediate cause (what specifically failed)
- Contributing factors (process, equipment, human error, supplier quality)
- Root cause category (from a configurable dropdown)
- Supporting evidence (photos, lab reports, attachments)
Root Cause & Corrective Action
Each NCR carries three free-text fields you fill in as the investigation progresses:
- Root cause - what actually caused the non-conformance
- Corrective action - what you're doing to fix this specific occurrence
- Preventive action - what you're changing so it doesn't happen again
You can also assign the NCR to a team member and record a financial impact estimate (scrap cost, rework cost, customer credit, etc.).
NCR Status Lifecycle
An NCR moves through six statuses as you work it:
An NCR can also be set to VOID at any point if it was raised in error. Closing an NCR (status CLOSED) records a closed timestamp for reporting.
AVAILABLE(after rework) or moving it to REJECTED is a separate action you take on the stock lot or through a follow-up QC inspection.NCR Reports
In the Inventory → Quality Control → NCRs tab, view:
- NCRs by date range, severity, product, or supplier
- Average time to resolution
- NCR rate by product or supplier (used for supplier scorecards)
- Open NCR aging report