IEMSuite

Quality & equipment

SPC & corrective actions

Follow a quality signal through to action.

Turn inspection trends into accountable follow-up.

For quality managers and process owners

Discuss your workflowSee it in a working day ↓
Example workflow Illustrative records

From measurement to owned follow-up

Upper control limitLower control limit
ReviewInvestigate variation
Corrective actionOwner + due date
Follow-upEvidence → review

A working day · example scenario

The latest result passed. The trend still deserves a look.

One inspection result cannot tell the whole process story. Repeated measurements can reveal variation, but a useful review also needs a way to assign follow-up and check whether the agreed work was completed.

  1. Read the measurements in sequence

    Use the SPC trend view to examine recorded QC measurements with control limits. Review Cpk when the available measurements and specification limits support it.

  2. Turn the investigation into owned work

    Create or review the relevant non-conformance record, then attach a corrective action with an owner and a due date. A chart does not automatically create an NCR.

  3. Review the evidence before closing

    Track submitted work and approval, and identify overdue actions. Keep the follow-up connected to the non-conformance that prompted it.

What you leave with

A quality review that ends with accountable follow-up, not an unexplained chart in a meeting.

Why we connect
these records.

We connect process analysis with corrective work because spotting variation and resolving its cause are different jobs. Measurements provide evidence; an owned action provides the next step. Both remain connected to the quality workflow.

Start with the inspection workflow →

Inside the workflow

SPC trends

View recorded test measurements over time with control limits.

Process capability

Review Cpk where the measurements and specification limits support the calculation.

Corrective actions

Link actions to non-conformance records with an owner, due date and evidence.

Review and closure

Review submitted work, track approval and highlight overdue actions.

Before you bring
it to your team.

Does SPC use a continuous sensor feed?

No. The charts use recorded QC measurements. Cpk is shown where the data and specification limits support the calculation; it should be interpreted with the process context.

Does a failed inspection automatically create corrective actions?

No. Non-conformance records and corrective work are managed explicitly. Actions carry an owner, due date and review flow. SPC and CAPA require Scale.

Continue exploring quality & equipment

Quality inspectionsEquipment calibration
View all features